whats the problem now?
cars at windsor are being stuck in storage anyone know the whys or what fors causing this?
|
RE: whats the problem now?
This looks like a job for ..........................Budman!
|
RE: whats the problem now?
Putting out the bat signal for Budman!
http://www.trapperjack.com/images/ia...signal-cel.jpghttp://www.outrageouslogos.com/image...les/budman.jpg |
RE: whats the problem now?
I was told, that they are being put into storage until a sufficient quantity is in place for shipment.
|
RE: whats the problem now?
Paladin,
I hope your right. I find it hard to believe, as it appears the actaul production process has stopped or slowed way down. One would think they would be building cars as fast as they could to fill up the trains, unless this is still part of the ripple effect from the wiring issue. But you would not think this would hold up production. Anyway I'm speaking because my car has been in D1 for over a week and it has not made it to framing yet, maybe I'm being punished or they are trying to see that I get Badge 6,400. |
RE: whats the problem now?
the delay is all my fault...I called up Dodge and insisted that no more cars get delivered until I get mine...
who says Dodge doesnt listen?!?!?!?!:D:D:D:D:D:D just kidding, but I am starting to worry about how much paint is being applied to my car, its been in 'paint' status since 6/5... |
RE: whats the problem now?
i heard that jay leno was going to offer dodge some storage space so hes probably got both our cars
|
RE: whats the problem now?
My build history in brief -
A detailed build history: CHALLENGER SRT-8 2008 Congratulations! This step was completed on May 27, 2008. Your Challenger’s current status. Order processing and confirmation. Confirmation We’ve received your order and plans to build your Challenger are underway. Congratulations! This step was completed on June 4, 2008. Your Challenger’s current status. Assembly of multiple body components into vehicle structure. A car as powerful as Challenger starts with a strong foundation. Your vehicle’s frame is now under construction. Congratulations! This step was completed on June 4, 2008. Your Challenger’s current status. Application of exterior paint and/or striping. Your Challenger is getting ready for its close-up. The sheet metal is currently being painted in your selected color. Congratulations! This step was completed on June 5, 2008. Your Challenger’s current status. Vehicle trim installation. Your vehicle is in final assembly. All the finishing touches are being applied. Congratulations! Your Challenger reached the Quality step on June 6, 2008. Quality Control The construction is complete and your Challenger is undergoing inspection to ensure the utmost in quality and safety. Congratulations! Your Challenger reached the build complete stage. Shipped to storage pending transportation on June 10, 2008. |
RE: whats the problem now?
It is now June 11. Did it ship?
Thanks, Dave |
RE: whats the problem now?
Is it possible that we are over thinking this and we are simply in holding until transportation can be cooridinated. I am sure that the transport company wants to carry only full carries in any direction. Fuel is a big issue.
|
All times are GMT -8. The time now is 12:26 AM. |
© 2024 MH Sub I, LLC dba Internet Brands