OK here is the update they are now building 1 Challenger to 4 Chargers/300's that is 232 a day. The total build per day for all cars is now is down to 930 total. One of the things that is slowing things down they are building a couple of 2009 6 speed pilot cars in the mix. They built a red one today. There is still a mandatory 5 day quality hold on Challenger's so each dept can check out the car. If it needs a fix they send it over to the tent/garage and fix it. This is a good thing for all of us unless they loose your car but I wont go into that.
The cars that got bumped back from D1 to D were probably bumped because they canceled the Sat overtime shift. They also have to catch up on all of the cars in the lot. There is just over 500 there waiting on there inspection's. They have shipped out several hundred so far. If your car was in D today it should be back in D1 on Monday and D1 will now be about 3-4 days until they start to build it.
ORIGINAL: Andre@Edge
Budman,
I ordered Silver 8H300590. Do you know if (or think) mine will go to D-1 Monday as well?
Thanks in advance. Andre