Dodge's Priorities
Those of you wondering why it is taking so long to get your SRT, look at these production numbers that were posted by Venthos:
"I" status or better = 11,237 Challengers built
SRT8's = 716 6.4%
RT's = 4,802 42.7%
SE's = 5,719 50.9%
"I" status or better = 11,237 Challengers built
SRT8's = 716 6.4%
RT's = 4,802 42.7%
SE's = 5,719 50.9%
it's always normal to bring out the SRT8's last.
they just changed it up a bit with the Chally by doing the 08 limited edition this time.
I've still only seen two 08's and no 09's besides mine in L.A.
they just changed it up a bit with the Chally by doing the 08 limited edition this time.
I've still only seen two 08's and no 09's besides mine in L.A.
My HO will kick your black ones ass ! J/P
But damn not many 09's being built at all looks like 09 will be the limited edition lol.
maybe it's the economy and gas ? And the fact that there is still many 2008's on the lot. Which have been going for a TAD BIT MORE on Ebay latley.
But damn not many 09's being built at all looks like 09 will be the limited edition lol.
maybe it's the economy and gas ? And the fact that there is still many 2008's on the lot. Which have been going for a TAD BIT MORE on Ebay latley.




