Ordering
#11
RE: Ordering
ORIGINAL: ResumeSpeed
You will be able to order the 2009s long before that, order banks will open in February or March, still trying to nail down the date. It's looking likely that they will open the banks near the debut of the base and R/T models in March.
Production of the 2009 models is currently set for June, earlier than originally planned.
ORIGINAL: Cuda340
The latest rumor is that you can order a 2009 starting in June.
The latest rumor is that you can order a 2009 starting in June.
Production of the 2009 models is currently set for June, earlier than originally planned.
#12
Senior Member
RE: Ordering
Delivery codes are now available:
codes for those who want to know
BB: Review by fleet department
BD: Special equipment processing
BE: Edit error
BG: Passed edit n/a for schedule
BGL: Edit ok parts unavailable
BX: Passed edit available for schedule
C: Sub firm
D: Firm schedule - dealer has allocation and all parts available
D1: Gateline schedule - scheduled to be built
E: Frame
F: Paint
G: Trim
I: Built not ok'd
J: Built ok'd
JB: Shipped to body vendor
JE: Emission check
JS: Shipped to storage
KZ: Released by plant , invoiced
KZL: Released - not shipped
KZM: First rail departure
KZN: First rail arrival
KZO: Delayed/recieved
KZOA: Plant holds
KZOB: Zone/distribution holds
KZOC: Carrier delays
KZOD: Carrier holds
KZOE: Mis-shipped vehicle
KZOF: Show/test vehicle
KZOG: Damaged vehicle
KZOH: All other reasons
KZT: Second rail departure
KZU: Second rail arrival
KZX: Delivered to dealer
ZA: Canceled
codes for those who want to know
BB: Review by fleet department
BD: Special equipment processing
BE: Edit error
BG: Passed edit n/a for schedule
BGL: Edit ok parts unavailable
BX: Passed edit available for schedule
C: Sub firm
D: Firm schedule - dealer has allocation and all parts available
D1: Gateline schedule - scheduled to be built
E: Frame
F: Paint
G: Trim
I: Built not ok'd
J: Built ok'd
JB: Shipped to body vendor
JE: Emission check
JS: Shipped to storage
KZ: Released by plant , invoiced
KZL: Released - not shipped
KZM: First rail departure
KZN: First rail arrival
KZO: Delayed/recieved
KZOA: Plant holds
KZOB: Zone/distribution holds
KZOC: Carrier delays
KZOD: Carrier holds
KZOE: Mis-shipped vehicle
KZOF: Show/test vehicle
KZOG: Damaged vehicle
KZOH: All other reasons
KZT: Second rail departure
KZU: Second rail arrival
KZX: Delivered to dealer
ZA: Canceled
Thread
Thread Starter
Forum
Replies
Last Post
caj
Dodge Challenger R/T
11
10-21-2008 07:22 PM
70sguy
General Dodge Challenger Discussions
7
06-03-2008 07:21 PM